Through the construction phase the BIM model is updated based on feedback from the site and architect. Any variation from the design is input in the BIM model to have a model that represents the as-built condition of the building.
STEP 02
As-built drawings along with the Revit BIM model is released to the architect at the end of this stage, to be used for maintenance through the life of the building.
All drawings have been generated from the 3D Revit Model
The Project Details have been masked for privacy as it is in the Construction Stage.