BIM

STAGE 05
Good For Construction

"Manufacturing & Construction"

STEP 01

As construction begins on site, clarifications might be needed if certain information is not clear from the drawings or is missing. This information is then added to the drawings, revisions marked, and sheets re-released.

STEP 02

If there are any unforeseen issues based on site conditions and the design requires change, the architects and services team provide a resolution. This information is updated in the BIM model to capture the changes. The relevant drawings are updated and released with revisions.

STEP 03

During the construction phase, if any new drawings are needed, they are created and released.

All drawings have been generated from the 3D Revit Model

The Project Details have been masked for privacy as it is in the Construction Stage.

Scroll to Top